Description:

GJS-44/83 intelligent pump Integrated Test Press
GJS-44/83 intelligent pump Integrated Test Press
GJS-44/83 intelligent pump integrated test press is my factory pump test a newly developed compressor, mainly for the old pump disassembly and the old and new pump test (the amount of pressure testing and leakage detection). Pressure test the process by PLC automatic control, automatic measuring the amount of leakage. Computer displays pressure, torque, the amount of data leakage, and automatic storage, reporting, printing and other functions.
First, structural characteristics The test mainly by the host and the console press the two parts. 1 Host: from the main, back tongs, brackets, oil control equipment, aircraft seat, walking trolley, power sources, fuel tank (hydraulic tank and diesel tank) so on. Is the completion of the dismantling pump, pressure test, Leakage test the main unit. The main, back clamp a small car equipped with a compression spring to walk to the main, back at work, can clamp the upper and lower micro-floating, so that on the shackle have a certain degree of freedom to guarantee the freedom not to hurt the deduction, non-stick button. Equipment, surrounded by security protection. Stand is equipped with back to tank, so that timely flow back into the fuel tank of diesel. 2 Console: The main control box by, PLC, computer and electrical components, safety voltage 24V. Completion of machine motion control. 2, technical parameters Scope: diameter: Φ38mm-Φ83 mm, length 4500 - 8000 mm of various types of pump Rated high torque: 2.2KN.m Rated low-end torque: 8.0KN.m High-grade rated speed: 54r/min Low-grade rated speed: 15r/min System Test Pressure :0-40 Mpa System rated pressure: 14Mpa (working pressure 5-9MPa) System Rated Flow: 75L/min The main dorsal clamp diameter: Φ160mm Equipment Total Power: 37KW Equipment Dimensions: length × width × height = 11000mm × 1160mm × 1550mm Third, pre-operational preparation and operation of Note An operation before the power switch should be opened to observe the ammeter, voltmeter are normal. Check the power cord is missing phase. Two power normal, open the electromagnetic relief valve switches, motor running, when motor is running normal (no-load in winter when the motor is running a few minutes) preparations. 3 motor running, check all oil line valve is normal, asphalt joints should be no leakage at all kinds of valve spool to be flexible movement. 4, when equipment is running the ministries to normal operating procedures can be carried out according to the test pump pressure and leakage in the test operation. 5 normal work under normal circumstances should be used when high-level, the working pressure to 5-9Mpa suitable.
Into the primary clamp pressure on the oil-side comparison table torque
Main clamp input pressure P MPa |
Output torque the main clampT KN |
1 |
0.255 |
2 |
0.51 |
3 |
0.764 |
4 |
1.018 |
5 |
1.27 |
6 |
1.527 |
7 |
1.782 |
8 |
2.036 |
9 |
2.291 |
10 |
2.545 |
11 |
2.8 |
12 |
3.055 |
13 |
3.309 |
14 |
3.564 |
15 |
3.818 |
16 |
4.072 |
|